More than 400 feet of new air piping connected a St. Paul packaging facility's production area to its main compressor room.

The facility needed to supply a production area previously served by an older reciprocating compressor. The new run had to connect to the main compressor room and existing piping.
We installed over 400 feet of piping and connected it to the existing network and compressor system. A small pinhole leak found during the work was isolated with a ball valve.
The main compressor room now supplied the production area through the new piping. Isolating the leaking compressor connection allowed the system to keep operating.